| Dried Distillers
Grain and Any Other Materials
Railcar Flow Issues
REDUCE UNLOADING TIMES
Pneumat Railcar Solutions:
Problem: Dried Distillers Grain
(DDG) is stuck in a railcar. DDG is usually bought, put in the railcars
hot and wet and then travel thousands miles vibrating and compacting
the entire journey. Then arrived to the mill with the DDG hard and
non-flowing.
Pneumat
Solution: The RailWhip/RailDrill
Railcar Cleanout System drastically reduces unloading times
and employee exposure to dangerous unloading activities. And lifting
point brackets allow for easy movement from hopper to hopper.
If the railcar is bridged over, start
by using the RailDrill and create a flow channel. Then use the RailWhip
to cleanout the DDG, or just the RailWhip can be used on other railcars
that already have a flow channel.
Problem: Midds are good for protein
but hard to handle. They cling to the walls of the railcar and make
for a long, dirty cleanup. Midds are stuck and there's a deadline
to unload them by tomorrow.
Pneumat
Solution: Reduce the time is takes to extract the midds and
other byproducts from railcars by using a RailWhip/RailDrill
to eliminate the clogs without dangerous poking or banging with
sledgehammers. The RailWhip/RailDrill will save you time, money
and headaches.
back to top |