| Cement
Build-ups
Precalciner & Tower Flow Issues
BREAK THE BUILD-UPS
Pneumat Precalciner and Preheater Tower
Solutions:
Problem: Build-ups in tower,
precalciner and chutes in-between. When the chemistry is off, it
chokes off production.
Pneumat
Solution: Wherever there is a build-up, a base socket can
be welded on at any stage or anywhere in-between so that Cardox
can be used to eliminate the problem. It can also be used as a preventative
measure by having base sockets that hold the tubes in place, in
various strategic positions, and use Cardox periodically.
AirForce
Air Cannons (formerly LADCO) in different spots can also be
used in these types of situations. With a control-timing box to
control all of them it makes make bulk flow safer, faster, easier.
The problem is cleared, literally
in seconds, and you’re back to full production again.
Problem: Shutdowns for maintenance issues and tower cleaning puts
employees’ safety at risk due to overhead build-up.
Pneumat Solution: The New Pneumat
TowerWhip will be just the right fit in the future. We are developing
a whip system that runs outside the tower and can reach areas overhead
at your own pace or have TeamPneumat
take care of cleaning the tower. Plus you’ll never have to
set up scaffolding inside the tower again.
Problem: The feedshelf to the kiln
gets clogged often.
Pneumat
Solution: Again, Cardox and AirForce can be used whenever
this problem arises or as a preventative tool. As shown below Cardox
base sockets are strategically placed on the outside or the feedshelf
so tubes can easily placed to eliminate any build-ups. Just set
them up, blast and watch your production increase.
back to top |